Specification
Open-circuit voltage, maximum power voltage, and maximum system voltage at 1000 V or 1500 V.
Buyer checklist
Solar module wholesale pricing starts after the lot is described. Piece count, pallet count, frame size, connector, and the US destination have to sit on the same line before a factory unit price means anything.
VoltPoint Procurement keeps this as a purchase checklist. It is not a stock offer and not an engineering release. Standard Test Conditions mean 1000 W/m2 irradiance, 25 C cell temperature, and the AM 1.5 reference spectrum. Record ratings under other test conditions separately.
Request Factory Quotes
Open-circuit voltage, maximum power voltage, and maximum system voltage at 1000 V or 1500 V.
State full pallets before loose modules. A 28-module pallet is an example of packing language, not a pack kept on this page.
Currency, per-module or whole-order budget, freight, and duties on one basis.
Flash-test list for the serial range, drawing, and the cited IEC 61215 edition.
Write cell technology as the buyer named it, dimensions in millimeters, connector series, and lead length. If module-level electronics are already specified, say so, because that changes the lead and the junction-box question. If the design is string-level, say the combiner path instead.
The DOE solar overview reviewed on 2026-10-26 explains parts of a PV system. It does not set a wholesale price or a pallet plan. Use it as vocabulary, then return to the quoted model.
| Field | Buyer entry | Factory reply |
|---|---|---|
| Rated power | Watts at STC | Same basis or a named alternate |
| Module efficiency | Percent and test | Confirm or leave open |
| Quantity | Modules and pallets | Minimum lot if different |
| Documents | Datasheet, drawing, flash list | File date and model code |
Unit price and delivered scope still pull in opposite directions. Matching accessories can make the unit price a fair screen. Skipping freight, duties, and the flash list can make a small unit price look complete when the lot is not. String-level gear may reduce device count in some layouts; module-level gear may offer per-module operation and monitoring, with different service and connector requirements. Voltage class is a separate design check and does not by itself select either architecture.
Three limits remain. No wind or seismic check is done here. No utility interconnection is filed. No listing is claimed until the factory file matches the model on the quotation.
Before a sample or pilot lot, agree quantity, payment, delivery, and acceptance criteria in writing. Match labels and serial numbers to the drawing and flash-test list, record dimensional and connector checks, and assign electrical acceptance to a qualified reviewer. Log mismatches before ordering the production lot. The factory must confirm MOQ, sample timing, production lead time, and warranty exclusions for the exact model.
See inquiry names, factory matching, and the procurement brief.
FREE sourcing support may be up to 3%. Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
Qualified business buyers
A confirmed benefit may be up to 3%.
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.